Resources

Handoff Template

A practical handoff template for passing over completed lightbox installs to South African retail and expo teams.

How Handoff Template keeps a lightbox project on track

Handoff Template gives retail and expo teams a clear record when a completed lightbox install is signed over. It should list the frame sizes supplied, graphics fitted, power points used, and any site notes the next team will need.

Record the exact lightbox supplied, the fitted fabric graphic, and where the transformer and plug point sit on site. In South African retail and expo venues, the handover sheet should also capture access limits, store trading rules, and any power interruptions that affected testing. A useful template leaves the next installer with dimensions, photos, and one clear record of what was signed off.

Include wide and close site photos before the team packs up. One image should show the full illuminated frame in position, while another should show cable routing, plug location, or hanging hardware. That small step helps when a mall contractor, merchandiser, or stand builder returns later to refit graphics or move the display.

Details to capture at sign-off

The handoff pack should show frame sizes, graphic references, test results, and any snags still open after installation. For a retail wallbox, that may mean noting the nearest isolator and the final lux check. For an expo build, it often means listing suspension points, packing status, and which components left with the stand crew.

Use the template alongside site photos, installer notes, and any mark-ups that explain changes made during fitment. Before goods leave the venue, confirm frame sections, printed skins, drivers, and spare connectors against the handover sheet. Lightbox quotes are built from the wall size, the frame depth and whether the unit is single or double sided.

  • Signed record of fitted frame sizes
  • Photos of wiring, graphics, and fixings
  • Space for store or stand contact

Site issues worth noting in SA

A South African handover often needs more than a tick-box list. Mall work may require after-hours access details, while expo halls may need stand numbers, freight dock timing, and rigging sign-off. Existing power outlets, previous frame holes, or inherited wiring should be written down so the next team does not rely on memory.

Coastal sites can leave residue on aluminium profiles and connectors, so cleaning or corrosion observations belong on the sheet. Inland retail locations often gather dust inside the frame channel, which matters when replacement graphics are due later. Where load-shedding interrupted commissioning, note what was tested on mains power and what still needs a live check.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

Notes that prevent repeat snags

Use the Handoff Template with site photos, handover dates, and notes on artwork, power points, or measurements that have already caused trouble. Write an honest subject line.

Write the handoff while the install is still in front of you, not days later from memory. Add measurements that differed from plan, trims made on site, and any artwork issue noticed once the lightbox was switched on. That record is especially useful when the buyer, centre management, or exhibition team asks what was finally installed.