Specs

Training Hang specs

Setup notes and briefing numbers for Training Hang.

Suspended frame spec checkpoints

The Training Hang specs page covers the technical and handling details for suspended fabric lightboxes. Use it when your team needs a clear reference for hanging setup, graphic fitting and maintenance checks.

For Training Hang, the spec sheet should record the finished frame size, hanging height, suspension method and power feed before artwork goes to print. Ceiling type matters on these jobs because trusses, concrete slabs and mall bulkheads each change the fixing detail. In Johannesburg and Pretoria, dust build-up on top caps and LEDs should be part of the maintenance note.

A clear site photo taken from below and from the fixing point helps the installer read access, clearance and neighbouring signage. Include the briefing number, graphic code and orientation on the page so the same frame is not rehung upside down after storage. This is especially useful for expo stock that moves between venues and packing crews.

What the sheet must capture

Your team needs one working reference for rigging, fabric fitting and routine inspection. Note the cable drop, transformer position and access method for future graphic changes. On suspended LED fabric frames, those details matter more than generic display notes copied from a wall-mounted unit.

Before sign-off, match the Training Hang entry to the frame dimensions, print size and hanging hardware listed for the job. Confirm that power leads, suspension cables and corner sections are counted on the packing list before dispatch. Lightbox quotes are built from the wall size, the frame depth and whether the unit is single or double sided.

  • Finished size and trim recorded
  • Suspension point checked from site photo
  • Packing list checked against hardware

Site conditions that affect hangs

Training Hang specs must account for venue access, ceiling restrictions and the working hours allowed by malls and exhibition halls. At large Gauteng sites, loading bays and lift sizes can affect which frame sections are practical to send. Existing wiring, older hanging points and landlord rules should be noted before any suspended lightbox is booked for install.

Coastal air can increase cleaning and inspection frequency for aluminium frames, connectors and power components. Inland retail sites often need extra wiping of fabric edges and top surfaces where dust settles above eye level. During load-shedding periods, illumination checks should be planned for times when mains power is available.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

Briefing details for suspended units

Add the venue name, ceiling height, access equipment and any previous failure on the existing hang. State whether the frame is single-sided or double-sided, and whether graphics will be changed on site or back at storage.

Capture the final hanging note while the rigging layout, cable lengths and power route are still visible on site. File it with the job record so the next install team can verify parts, orientation and maintenance points without guessing.

What our LED Lightbox customers say

Verified Google reviews